Loading files
This file is pinned to the selected release. Download the original to open it in your design tool.
7315b96d0This file is pinned to the selected release. Download the original to open it in your design tool.
# 07 — PCB Placement
**Workflow steps:** [Phase 6](../workflow/06-placement-planning.md)–[Phase 9](../workflow/09-automated-placement.md) · **For:** electronics engineers.
- **Purpose:** decide where every component sits, then place them — cleanly and
practically.
- **What you need:** a clean (audited) schematic.
- **What you get:** a placed board that is manufacturable and assemblable, with no
spacing violations.
## The four stages
1. **Placement planning (you lead).** You define the physical facts: board size and
shape, where the connectors and USB go, sensor positions, the MCU location,
mounting holes, keep-out areas, and any preferences. These are *your* mechanical
decisions.
2. **Placement knowledge graph (the AI thinks first).** Before moving anything, the
AI works out what must sit near what and why — high-current paths, heat sources,
analog vs digital separation, EMI-sensitive parts, decoupling caps next to their
chips.
3. **Visual placement plan (you approve).** The AI shows you a **map** of the zones
before touching the board. You check it against your requirements and it refines
until you're happy.
4. **Automated placement (the AI executes).** Once you approve the map, the AI places
all components and checks the real spacing.
## What you do
- Provide the mechanical constraints (step 1).
- Approve the visual map (step 3) — this is the key checkpoint. A board that passes
every electrical rule but can't be plugged in or assembled is a failure.
- Approve the final placement.
## What the AI does
- Builds the placement reasoning, proposes the zone map, then places and re-checks on
the **real** board geometry (not just an estimate).
- Keeps decoupling caps close to their chips, opens connectors to the board edge, and
keeps sensors that work together aligned to the same axis.
## What good looks like
- Connectors, USB, and button sit on the edge and open outward.
- No two parts too close to hand-solder; nothing over a mounting hole or keep-out.
- The layout leaves room for the routing that comes next.
## Common mistakes
- Letting placement start before you've fixed the board outline and connector
positions.
- Judging placement only by a screenshot — approve it against real dimensions.
- Optimizing for short wires at the cost of assembly — practicality wins.
## Validation checklist
- [ ] Board outline, connectors, mounting holes, keep-outs defined.
- [ ] Visual placement map approved against requirements.
- [ ] Final placement has 0 spacing violations on real geometry.
- [ ] Edge parts open outward; sensors aligned; decaps close to chips.
- [ ] I approved the placement.
## Next step
The placed board moves to KiCad for routing.
---
◀ [06 — Schematic generation](06-schematic-generation.md) · Next ▶ [08 — Routing](08-routing.md)