f826f6f1No parent assembly in this project.
| Part | References | Qty | Lifecycle | Suppliers | Availability | Unit price |
|---|---|---|---|---|---|---|
schematicscollection | — | — | — | — | — | — |
backpackcollection | — | — | — | — | — | — |
case RS30Xcollection | — | — | — | — | — | — |
case SCS0009collection | — | — | — | — | — | — |
case SG90collection | — | — | — | — | — | — |
contributedcollection | — | — | — | — | — | — |
v1collection | — | — | — | — | — | — |
webcollection | — | — | — | — | — | — |
Supplier data covers the selected manufacturer part or matched alternatives. * Currency was not supplied; confirm it with the supplier. A quantity after @ is the minimum order for that price. Click a supplier count or price for sourcing details.
Repeated equivalent parts are grouped within each assembly. Quantities include parent quantities; assembly rows and their children are not added together. CAD representations and unconfirmed relationships are excluded from manufacturing totals. Documented quantities retain their source basis and do not imply a verified procurement plan. Lifecycle uses the best reported state among the selected part or eligible, non-rejected alternatives: Active, then NRND, then Obsolete. Last-time-buy counts as NRND. Supplier-state counts and missing reports appear in the tooltip. ≥ marks partial supplier coverage. Prices are dated observations. Currency is shown when supplied; prices without a currency are indicative observations, not comparable quotes. Offer-specific minimum order quantities appear in the table and observation dates appear on hover. Recorded costs remain separate under Engineering details.
| Part | References | Qty | Lifecycle | Suppliers | Availability | Unit price |
|---|---|---|---|---|---|---|
schematicscollection | — | — | — | — | — | — |
backpackcollection | — | — | — | — | — | — |
case RS30Xcollection | — | — | — | — | — | — |
case SCS0009collection | — | — | — | — | — | — |
case SG90collection | — | — | — | — | — | — |
contributedcollection | — | — | — | — | — | — |
v1collection | — | — | — | — | — | — |
webcollection | — | — | — | — | — | — |
Supplier data covers the selected manufacturer part or matched alternatives. * Currency was not supplied; confirm it with the supplier. A quantity after @ is the minimum order for that price. Click a supplier count or price for sourcing details.
Repeated equivalent parts are grouped within each assembly. Quantities include parent quantities; assembly rows and their children are not added together. CAD representations and unconfirmed relationships are excluded from manufacturing totals. Documented quantities retain their source basis and do not imply a verified procurement plan. Lifecycle uses the best reported state among the selected part or eligible, non-rejected alternatives: Active, then NRND, then Obsolete. Last-time-buy counts as NRND. Supplier-state counts and missing reports appear in the tooltip. ≥ marks partial supplier coverage. Prices are dated observations. Currency is shown when supplied; prices without a currency are indicative observations, not comparable quotes. Offer-specific minimum order quantities appear in the table and observation dates appear on hover. Recorded costs remain separate under Engineering details.
No parent assembly in this project.