# Hardware Files
This directory contains manufacturing-ready files for the Chibi-ECEN-BMS hardware versions.
## Contents
### [bms-v01/](bms-v01/) - Version 1 (Manufactured & Tested)
Complete manufacturing files for Version 1, which was designed in February 2015, manufactured in March 2015, and successfully tested.
**Status**: ✓ Manufactured, ✓ Assembled, ✓ Tested
**Files**:
- `bms_v01_schematic.pdf` - 3-page schematic (battery monitoring, microcontroller, interfaces)
- `bms_v01_layout.pdf` - PCB layout (4-layer board, ~100mm x 75mm)
- `bms_v01_assembly_bom.csv` - Bill of materials with part numbers
- `gerbers/` - Complete gerber files for PCB manufacturing
**Manufacturing Specifications**:
- 4-layer PCB
- Dimensions: ~100mm x 75mm
- Thickness: 1.6mm
- Min trace/space: 6/6 mil
- Min drill: 0.3mm
- Finish: HASL or ENIG
- Solder mask: Green
- Silkscreen: White
## Manufacturing Information
### Hand Assembly
The v0.1 prototype boards were hand-assembled to save on cost and schedule.
**Assembly Considerations**:
- LT6803 is QFN package - requires good soldering skills or reflow oven
- STM32F303 is LQFP48 - manageable with fine-tip iron
- Most passives are 0603 size - tweezers and magnification helpful
- Stencil recommended for solder paste application
**Tools Needed**:
- Soldering iron with fine tip (Hakko FX-888D or similar)
- Hot air station (for QFN packages) or reflow oven
- Tweezers, flux, solder paste
- Multimeter for testing
- Oscilloscope for verification (recommended)
## Testing
After assembly, follow the test procedure in [../testing/test-procedure.pdf](../testing/test-procedure.pdf).
**Basic Tests**:
1. Visual inspection - Check for shorts, proper component placement
2. Power-on test - Verify 3.3V and 5V rails before connecting battery
3. Microcontroller test - Program and verify LED blink
4. LT6803 test - Verify cell voltage readings
5. CAN bus test - Verify communication with test device
6. microSD test - Verify file read/write
**Safety Warning**:
- Do not connect battery until power rails are verified correct
- Use current-limited power supply for initial testing
- Start with low voltage (e.g., 3S pack) before full 7S pack
- Monitor for smoke, heating, or unusual behavior
## Design Files
Native Eagle CAD design files are located in [../design-source/eagle/](../design-source/eagle/).
**Files**:
- `bms_v01.sch`, `bms_v01.brd` - Version 1 Eagle files
- `bms_v02.sch`, `bms_v02.brd` - Version 2 Eagle files
**Eagle Version**: Designed with Eagle 6.x or 7.x
## License
Hardware design files are released under the MIT License. See [../LICENSE](../LICENSE) for details.
---
**Disclaimer**: This is a student project from 2015. While care was taken in design and the hardware was successfully tested, use at your own risk. Battery management systems require careful design for safety.
715a7cb82This file is pinned to the selected release. Download the original to open it in your design tool.